Year
1971
Description
PDC Construction was awarded the contract in January 1969 to construct a new (No.3) berth and to extend Berth 1.
The work was completed in March 1971 and the first vessel to use the new Berth 3 was the ‘Amstelmolen’.
Berth 3 was 640 feet (195m) long, and with the 94 foot (28.6m) extension to Berth 1, a continuous wharf face of 1847 feet (563m) was available.
Select port