Berth 1 (Harbour Works)

Year
1964
Description

Further work on the breakwater. Work commenced in March on the new land-backed Berth 1, by contractor John Holland Constructions Pty Ltd. It is a steel and concrete structure on tube piles with a length of 634ft (193m), width of 73ft (22.25m) and depth alongside of 34ft (10.3m)

Esperance celebrated its Centenary with a Festival - 100 years of settlement.

Select port