Year
1988
Description
In 1988–1989: 1,400,000 m3 of spoil was removed. The harbour basin was deepened by 2m to 12.8m, channel entrance widened by 70m and a 100m long spur groyne was constructed on the offshore side of the breakwater.
Select port